News for hackers. Stuff that matters.
Re:The hunt for dollars to build the $64B bullet train by Animats on Monday December 26, 2016 @01:33AM (#13257248)
The most expensive line under construction is the Tokyo-Nagoya maglev line, at $50 billion for only 286km. It's maglev at 500km/hr, and it's 90% in tunnels. They're going straight through the Japanese Alps. Under construction since 2013, opening scheduled for 2027.

43km of track is already in operation as a test track. Here's a ride video.[1]

JR expects it to be profitable.

[1] https://www.youtube.com/watch?v=5CKwchJKTYU

Re:The hunt for dollars to build the $64B bullet train by akiselev on Monday December 26, 2016 @03:13AM (#13257460)
That is an early cost estimate and tunneling estimates are by far some of the most innacurate in civil engineering because you never know how much the geology will differ from what the estimate assumed. Construction on the first tunnel segment started a year ago and won't be complete until the 2020s so it'll take a while before the developer knows how bad the overrun will be on that section, let alone for the whole line.
Re:The hunt for dollars to build the $64B bullet train by Animats on Monday December 26, 2016 @01:31PM (#13259215)
They already have 40Km of tunnel open with trains running.
Re:The hunt for dollars to build the $64B bullet train by trome on Monday December 26, 2016 @05:54AM (#13257808)
Sooo crunchy there, jeez! Tunneling isn't as unpredictable as you suggest, rail lines are often completed on time and under budget[1]. When you do crazy stuff like try and build the largest tunnel ever built with cutting edge technology and don't plan for failure[2], that is when things go bad.

Luckily, rail doesn't need giant tunnels, tunnel boring machines for that size tunnel are a known quantity.

1 - https://www.ch2m.com/newsroom/news/new-seattle-light-rail-li...

2 - http://q13fox.com/2016/07/21/bertha-seattle-tunnel-project-2...