In 2015 in the US, installation labor accounted for only 11% of the cost for utility scale fixed tilt PV farms like this one ($0.19 out of $1.77 per watt project costs): http://www.nrel.gov/docs/fy15osti/64746.pdf
Land costs were less than 2% ($0.03 per watt).