Re:India has launched a 648MW solar power plant by yummyfajitas on Wednesday November 30, 2016 @08:31AM (#13070467)
Social technology is an important concept: http://thefutureprimaeval.net/social-technology-and-anarcho-...

This is not a situation limited to solar energy. In India we have the social technology to organize men and build large projects. The US had this technology 100 years ago, but we've lost it.

Trains

Delhi metro, phase 2: 77 miles of track, 85 stations, $2.9B, 3 years.

Hudson Yards NYC: 1 mile of track, 1 station, $2.5B, 9 years.

Green line expansion, Boston: 4 miles of track, 4 stations, $3.1B, 7 years (if all goes according to plan).

Space exploration

Mangalyaan mission to mars: $74M.

A movie about Matt Damon getting stuck on mars: $108M.

Re:India has launched a 648MW solar power plant by pjc50 on Wednesday November 30, 2016 @08:34AM (#13070490)
Labour costs and safety levels are going to be a huge part of this discrepancy. As are things like legal safeguards on eminent domain and environmental impact.
Re:India has launched a 648MW solar power plant by saosebastiao on Wednesday November 30, 2016 @10:06AM (#13071297)
Labor costs rarely make it into the double digits when it comes to percent of total costs of large infrastructure projects. And even if they were, that wouldn't explain the discrepancy. The infrastructure construction costs in very first-world Western Europe are closer to the costs found in India than they are to the costs found in the US.
Re:India has launched a 648MW solar power plant by danenania on Wednesday November 30, 2016 @10:40AM (#13071572)
If it's not labor, where's all that extra money going to for US projects then? Materials? Legal fees?
Re:India has launched a 648MW solar power plant by saosebastiao on Wednesday November 30, 2016 @12:18PM (#13072571)
To say it's not labor is not entirely true. I'm just claiming that labor isn't a huge part...at best it contributes in the single digit percentages.

The real answer is much more complicated and there is no easy one-size-fits-all answer. Environmental regulation, litigious environment in the construction industry, overuse of contractors and consultants instead of in house expertise, buy america provisions, labor scheduling rules, poor planning, supplier market that has been drastically cut off due to bidding complexity and procurement regulation, bad incentives, poor oversight, corruption, incompetence, etc ad infinitum. If you had to sum it up, you could say that the US is uniquely incompetent in all aspects of government-sponsored infrastructure projects.

Re:India has launched a 648MW solar power plant by maverick_iceman on Wednesday November 30, 2016 @12:06PM (#13072435)
A lot of it has to do with byzantine regulations.
Re:India has launched a 648MW solar power plant by eli_gottlieb on Thursday December 01, 2016 @01:39PM (#13082100)
Mostly legal haggling about land ownership and various rights like that.
Re:India has launched a 648MW solar power plant by transfire on Wednesday November 30, 2016 @03:01PM (#13074180)
Try: right to the top.
Re:India has launched a 648MW solar power plant by maverick_iceman on Wednesday November 30, 2016 @12:05PM (#13072423)
The Mangalyaan comparison is not really fair as it's just a technology demonstrator (not to minimize the achievement btw, getting to Mars on the first try is a big accomplishment) whereas NASA's Mars Science Laboratory with Curiosity Rover is much more advanced. You also need to factor in the much lower employee costs in India.