Re:Introducing Amazon Wind Farm Texas
by windchick on Tuesday September 20, 2016 @01:05AM
(#12537189)
They imply 45 cap factor with the 1,000,000 MWh which is expected for Scurry Co and the newer turbines. 1000000/(253*8760) ...rounded ignoring leap year.
/ 365 / 24 = 114 MWh per hour on average. Or ~250 MW nameplate power depending on capacity factor.
Ed: They list 253 MW.