Most load is predictable; only a little bit is spiky. You don't really need to power 2,500 homes for a full day; you need to power five or ten huge factories at temporary overcapacity for a few minutes at a time, as reserve plants spin up/down.

Consider EC2: you have reserved instances, and then you have autoscaling. If you know the total amount of work is going to predictably rise, you just buy more reserved instances (i.e. build more real power plants.) The non-reserved "elastic" VMs (like the batteries) are just to soak up your highly unpredictable excess load.

Or, think less of a power plant, and more of a capacitor: if a capacitor is way more than is strictly needed to soak up any possible load spike in a system, then we'd say that the system is overengineered, even if a later version of the same system might have enough load to blow that same capacitor. It's "massive" in terms of the predicted load spikes it's facing, not massive in terms of the long-term consumption trend of the system.

There are no comments on this comment yet.