Re:The Metaprogrammer
by pjc50 on Wednesday September 07, 2016 @10:09AM
(#12443487)
The single 4:3 monitor is rather like the famous Van Halen rider about "no brown M&Ms": it's an opportunity to red-flag the employer.
Monitors are cheap, at most one or two developer-days of salary. If you can't get a monitor, what happens when you need to buy some more specific piece of equipment?
A previous employer had an extremely liberal policy on letting us just buy anything that cost <£100. Obviously we recognised this was a privilege that would be taken away if abused, so we didn't use it much, but it was tremendously liberating. Want an evaluation board? Need a cable? Or a book? Done!
Previously I've had to do a PO for a box of M5 bolts. That's the morale-draining opposite, especially if you have to sit around wasting several orders of magnitude more than the cost for the paperwork to be done.
(Aerospace people excepted where it's actually required)
Oh, and it is too noisy to concentrate in this open plan office without headphones.
Monitors are cheap, at most one or two developer-days of salary. If you can't get a monitor, what happens when you need to buy some more specific piece of equipment?
A previous employer had an extremely liberal policy on letting us just buy anything that cost <£100. Obviously we recognised this was a privilege that would be taken away if abused, so we didn't use it much, but it was tremendously liberating. Want an evaluation board? Need a cable? Or a book? Done!
Previously I've had to do a PO for a box of M5 bolts. That's the morale-draining opposite, especially if you have to sit around wasting several orders of magnitude more than the cost for the paperwork to be done.
(Aerospace people excepted where it's actually required)
Oh, and it is too noisy to concentrate in this open plan office without headphones.