Re:Musk urges Tesla workers to cut costs ahead of fundraisin... by lukasm on Saturday September 03, 2016 @01:32PM (#12420106)
The biggest problem for Tesla is battery cost. They have to increase the production to drive down the price, so they want to leverage SolarCity to sell more Powerwalls. Tesla can use solar panels for supercharger stations where grid electricity is not available. You can create a new product or solution etc. etc. There is quite a lot of synergy.
Re:Musk urges Tesla workers to cut costs ahead of fundraisin... by sachingulaya on Saturday September 03, 2016 @01:45PM (#12420181)
You may be underestimating the power draw of supercharger stations. My model X pulls 200-300Amps of 400V power at a supercharger station with 8-12 stalls.

That is over 80,000watts per stall.

Re:Musk urges Tesla workers to cut costs ahead of fundraisin... by ranman on Saturday September 03, 2016 @02:50PM (#12420498)
Just to clarify -- it does not maintain that power. It will quickly ramp up to that on empty-ish batteries (320 amps at 320 volts is max that I know of) and maintain that until the battery is ~50% full. It will then ramp down and charge more slowly. While I can make lots of guesses as to why they charge in this way I don't know for sure on any of them.
Re:Musk urges Tesla workers to cut costs ahead of fundraisin... by flyinglizard on Saturday September 03, 2016 @03:32PM (#12420711)
This is how Lithium batteries are charged - CC/CV. You first have constant current stage, then as the battery fills up you shift into constant voltage stage where the current is gradually reduced until the battery is full.

However CC/CV change doesn't normally happen at 50%, but further down the charging cycle. It may be that Tesla throttles the current ahead of time due to thermal constraints of the charging system.

Re:Musk urges Tesla workers to cut costs ahead of fundraisin... by jakub_h on Saturday September 03, 2016 @01:46PM (#12420191)
Which is quite an incentive to save on electricity as much as you can, I'd think.
Re:Musk urges Tesla workers to cut costs ahead of fundraisin... by hindsightbias on Saturday September 03, 2016 @03:04PM (#12420563)
10kW array would be at least 600 sqft, so that will be a lot of commercial real estate.

The state/feds should stop subsidizing utility solar and incentivize covered parking lot panels. Prettier than lots and putting the energy where the cars are.

Re:Musk urges Tesla workers to cut costs ahead of fundraisin... by stevep98 on Saturday September 03, 2016 @02:22PM (#12420357)
But the stalls work in pairs. They all can't deliver 80kw simultaneously. Ever wondered why sometimes you only get 100A? Because your neighbor, who got their first, gets first dibs on the power, and you get the leftovers.
Re:Musk urges Tesla workers to cut costs ahead of fundraisin... by ranman on Saturday September 03, 2016 @02:51PM (#12420506)
I've never actually experienced this. I believe the 320 amp / 320 volt charging is for emptier cars... I've plugged in at a 100% full charger and gotten full power charging.
Re:Musk urges Tesla workers to cut costs ahead of fundraisin... by stevep98 on Friday September 09, 2016 @04:35PM (#12465849)
As you know, the fuller your battery gets, the less current it draws.

If your neighbor was already at the end of their charge cycle, then they will be drawing relatively little, and you'll get the full current.

Re:Musk urges Tesla workers to cut costs ahead of fundraisin... by sachingulaya on Saturday September 03, 2016 @06:00PM (#12421433)
I found this description of a 'typical' supercharger setup:

"The eight bay setup takes a 12kV, 750kVA feed from the utility, steps it down to 480V three phase on site, pushes that into 2000A switchgear which feeds four (one for each pair of bays) SuperCharger units at 480V/200A."

Re:Musk urges Tesla workers to cut costs ahead of fundraisin... by martinko on Saturday September 03, 2016 @01:45PM (#12420186)
Eh. Is solar really currently a viable alternative that can power superchargers?
Re:Musk urges Tesla workers to cut costs ahead of fundraisin... by jakub_h on Saturday September 03, 2016 @01:49PM (#12420205)
Technically, it's primarily a DC source. Batteries are a DC sink. It actually seems to make a lot of sense to charge the latter from the former.
Re:Musk urges Tesla workers to cut costs ahead of fundraisin... by martinko on Saturday September 03, 2016 @01:55PM (#12420227)
Im not really well versed in energy generation - do you have an estimate how many solar panels would be needed to power one supercharger at full capacity?
Re:Musk urges Tesla workers to cut costs ahead of fundraisin... by sandworm101 on Saturday September 03, 2016 @02:14PM (#12420314)
A couple acres? No joke. To generate the 50-80,000watts necessary for each stall you will need city-blocks worth of solar. If it's cloudy or at dawn/dusk, more. If you want to charge cars during the day and night, triple the number of panels and get some massive batteries.

Say 120 watts per m2. 80,000/120 =~ 650m2. That's the ideal. Then for dawn/dusk, 1200m2 and triple that to run it at night ... 3600m2 ... just shy of the 4050m2 in an acre. But even that is 3600m2 perpendicular to the sun not on the flat ground. To get that 3600m2 in the real world (not on the equator) you will have to spread the panels out on a much larger lot (much depends on the location and time of year). If I were buying land, I'd estimate 2-2.5 acres for solar per stall.

Re:Musk urges Tesla workers to cut costs ahead of fundraisin... by nardi on Saturday September 03, 2016 @03:11PM (#12420595)
This is ridiculous. People aren't charging 100% of the time, and even when in use, the chargers burst to 80kW, but they don't average 80kW. All you need are some batteries to level the load. Assuming 20kW average, and stall being used 20% of the time, that brings your calculation down to 4,000/120 =~ 33m2. Accounting for night and bad weather, let's quadruple that to 133m2. That's about a quarter of an acre for EIGHT stalls.
Re:Musk urges Tesla workers to cut costs ahead of fundraisin... by sandworm101 on Saturday September 03, 2016 @03:38PM (#12420742)
I skipped many other multipliers that negate any error in the needed wattage per stall. Top of the list: latitude. Demand will be constant throughout the year, but solar output can be radically different depending on the season. Then, is the horizon flat? If it isn't, then you aren't getting as many hours of sun. Then whether the panels are fixed or sun-tracking (tracking is better but require more space/maintenance). Tracking rigs are also much less space efficient when the sun is low. They end up shadowing each other for much of the day. Access roads, setback from obstructions (treelines) panel output degrading over time, energy losses in/out of batteries ... there are scores factors to undermine the per-acre efficiency of small solar farms located near to consumers. Imho tesla would do far better by building large solar farms in perfect locations and hooking them into the public grid. Panels at the charging stations can be the window dressing.
Re:Musk urges Tesla workers to cut costs ahead of fundraisin... by ranman on Saturday September 03, 2016 @02:56PM (#12420524)
Just a clarification-- the chargers burst to that 80kW range but they don't maintain it. Typical charging is closer to the 10-20kW range.

In addition people are not constantly charging.

Re:Musk urges Tesla workers to cut costs ahead of fundraisin... by sandworm101 on Saturday September 03, 2016 @03:15PM (#12420616)
Budgeting solar is like chopping firewood for winter. You cut as much as you think you need. Do that again. Then the whole process again.

There are so many factors that can diminish the amount of power available at a particular location that the only reasonable thing to do is overbuild. Imagine a line of teslas at an upstate New York charging station. They cannot get to work without power. But it's raining. And it's winter. And it's 6am. And that treeline has grown a foot higher, pushing dawn back an hour. You cannot have too many panels.

Re:Musk urges Tesla workers to cut costs ahead of fundraisin... by jakub_h on Saturday September 03, 2016 @02:16PM (#12420324)
Lots of them. A few hundreds, I think. Viability may depend on site. But if there's space nearby for a reasonable array, there doesn't seem to be any reason not to use it no matter how small it gets (any size will result in savings), unless your electricity is dirt-cheap, or the place is so infrequently used that for a significant portion of the time, nobody is charging (which would waste a portion of the local generation and worsen the ROI).