Re:Ask HN: Choosing a Side Project
by cauterized on Saturday August 27, 2016 @08:03AM
(#12371989)
Yes, I'd love to do that. Trouble is, the last couple MVPs I did took 6-18 months each, due mostly to limited time available. (And no, they couldn't be pared back further - these were basically proofs of concept). Hence the question!
It's generally easier to optimize this path, then to "pick the right idea." Because it's basically impossible to know ahead of time. And, besides, you'll learn a lot through each iteration. Good luck!