Re:Automated to Death (2009)
by Jtsummers on Friday July 01, 2016 @02:57PM
(#12018773)
That's fair. And see my comment in the parallel thread. In that situation, I think the original tester just never conceived of the possibility that there would be a failure with reporting of fires when two systems which functioned individually were run together. So the procedures didn't have the situation defined in the test plan. It was in beefing up the test procedures that the error was discovered (and others).
[ Parent
| on HN ]
Re:Automated to Death (2009)
by ArkyBeagle on Saturday July 02, 2016 @02:21AM
(#12021610)
"The original tester" was probably working from a Byzantine morass of requirements.
Surprisingly not. I got to read all the original documents. They were unimpressive in every way.
I had the pleasure of putting everything into a proper requirements tracking database (a thing that company actually did get right by the time I got there, moved away from word and excel based document systems). It was all pretty straightforward and a very simple system in the scheme of things. Fundamentally the sensors all worked fine. There was a box which collected all the sensor data and that was what was failing.