Re:The problem with reinforced concrete
by ArkyBeagle on Saturday June 25, 2016 @04:56PM
(#11977948)
"...which of course lead to our engineering fees looking like a larger portion of the job."
So there you go. Mismeasurement is 99% of all business problems. I've been laid off before because I didn't generate the (apparently) required level of software defects and missed a gate or two by a day or two doing it. I was actually told I didn't look busy enough.
So there you go. Mismeasurement is 99% of all business problems. I've been laid off before because I didn't generate the (apparently) required level of software defects and missed a gate or two by a day or two doing it. I was actually told I didn't look busy enough.