That's cakewalk. The NorNed 700 MW HVDC undersea cable, finished in 2008, is 580 km.
https://en.m.wikipedia.org/wiki/NorNed
Edit: the engineering would be relatively easy, but the politics are the problem.
String wires over the Korea Strait? Undersea cables? The shortest distance from Korea to the Japanese island at the mid-point is 50km and from there to the mainland is even more (by eyeball).