Re:The Immobile Masses: Why Traffic Is Awful and Public Tran...
by bradleyjg on Thursday March 24, 2016 @04:05PM
(#11355989)
There's problems on the operations side too. The same agency that is building that East Side Access (LIRR) still does fare collection by sending well compensated employees walking up and down every train to punch paper tickets twice per ride.
I don't know if it's an urban legend or not, but I've been told that one of those conductors punching tickets on every train is technically designated and paid as a "fireman" i.e. person responsible for shoveling coal into a boiler because the collective bargaining agreement forbids them from eliminating the position.
Re:The Immobile Masses: Why Traffic Is Awful and Public Tran...
by verg on Thursday March 24, 2016 @03:46PM
(#11355841)
Another good overview from Matthew Yglesias: http://www.vox.com/2014/6/2/5771880/us-mass-transit-construc...
From 2012[3]: "When asked by transit blogger Benjamin Kabak about its high construction costs, Michael Horodniceanu, president of the New York City Metropolitan Transportation Authority’s capital construction division, gave a two-word answer: “work rules.” Citing the example of the city’s revered sandhogs, he said the MTA employs 25 for tunnel-boring machine work that Spain does with nine."
[1] https://pedestrianobservations.wordpress.com/2011/05/16/us-r... [2] https://pedestrianobservations.wordpress.com/category/transp... [3] http://www.bloombergview.com/articles/2012-08-27/labor-rules...