Re:Analyzing Caltrain Delays by mattcaywood on Friday March 11, 2016 @09:10AM (#11266661)
The data is very much consistent with the bridge work hypothesis. The website indicates a series of bridges are being replaced. Starting 9/28/15 with Tilton Ave. and proceeding northward to Monte Diablo Ave then Santa Inez Ave.