Re:Analyzing Caltrain Delays by ZanyProgrammer on Thursday March 10, 2016 @05:45PM (#11263129)
To be (grudgingly) fair to Caltrain, a lot of things are perhaps indirectly out of their control-stuff like suicides (until you get gated platforms to stop people from jumping in front of Baby Bullets) and vehicles stopped on tracks are hard to predict. Likewise they are a victim of their own success-standing room only trains make boarding and unboarding longer than they have to be.

Of course, Caltrain has put off electrification and grade separation for a long time, and even now its massively expensive and ruinous (see the CBOSS fiasco) so its not like they are totally off the hook.

Re:Analyzing Caltrain Delays by twblalock on Thursday March 10, 2016 @05:50PM (#11263156)
The major cause of the problem is the balkanization of transit planning in the Bay Area. Most metropolitan areas this size have some kind of transit authority that plans systematically for the entire region. We are stuck with multiple incompatible systems, and small NIMBY cities like Menlo Park get to block development that would benefit everyone.
Re:Analyzing Caltrain Delays by avuserow on Thursday March 10, 2016 @07:20PM (#11263660)
Vehicle and person hits cause exceptional delays, but not significantly more so than the string of breakdowns in February. They apologized for this, and seem to have fewer rush hour problems, so maybe this has improved.

They could do more to improve the standing room problem, which adds up quickly. My evening train is now perpetually 3-5 minutes late, which adds 10% to the runtime, due to the train in front being overcrowded. They are putting out new timetables for next month that they claim will improve this. Their fix is to move its departure time closer to the slow train in front, and add 3 minutes to the trip duration. Frustrating.

Re:Analyzing Caltrain Delays by archagon on Thursday March 10, 2016 @05:49PM (#11263151)
I can't help but feel that if there was a BART line where the Caltrain currently runs, things would be about a hundred times better than they currently are, on all fronts. Alas...
Re:Analyzing Caltrain Delays by avuserow on Thursday March 10, 2016 @07:06PM (#11263590)
What I perceive as the good bits of BART could be replicated on Caltrain with much less effort than replacing Caltrain with BART: the off-peak timetable. Caltrain does better for longer trips in my (limited to South Bay) experience, which makes sense since Caltrain average trip length is 1.5x to 2x longer than BART's. But overall, getting improvements seems much less technical and more political, and neither system seems to have much luck.
Re:Analyzing Caltrain Delays by ZanyProgrammer on Thursday March 10, 2016 @06:00PM (#11263213)
BART should've taken over SP's Peninsula Commute in the 70s, when SP really wanted to get rid of it. Even better would be if BART ran standard gauge and overhead wire.
Re:Analyzing Caltrain Delays by jrnichols on Thursday March 10, 2016 @07:09PM (#11263606)
BART tried to, but IIRC San Mateo county unwisely pulled out of the project back in the early days. Part of the reason that it took ages to get BART to Millbrae. That Daly City - Colma - SFO extension took way longer than it should have.
Re:Analyzing Caltrain Delays by ZanyProgrammer on Thursday March 10, 2016 @05:58PM (#11263198)
Electrified Caltrain is infinitely preferable to BART.
Re:Analyzing Caltrain Delays by archagon on Thursday March 10, 2016 @06:35PM (#11263440)
Only if you get rid of the behemoth slowpoke trains, elevate the rails, add more rail lines, and add a corridor to the East Bay. The Millbrae Caltrain/BART connection is a joke.
Re:Analyzing Caltrain Delays by nulltype on Thursday March 10, 2016 @06:21PM (#11263337)
Why electrified vs normal caltrain? Will that decrease the variance or door to door time of using caltrain?
Re:Analyzing Caltrain Delays by ac29 on Thursday March 10, 2016 @07:10PM (#11263613)
There is a lot of info here [1], summarized here [2]. Probably of the most interest to most people is "Improved Train Performance, Increased Ridership Capacity and Increased Service: Electrified trains can accelerate and decelerate more quickly than diesel-powered trains, allowing Caltrain to run more efficiently. In addition, because of their performance advantages, electrified trains will enable more frequent and/or faster train service to more riders".

[1]http://www.caltrain.com/projectsplans/CaltrainModernization/... [2] http://www.caltrain.com/Assets/Caltrain+Modernization+Progra...

Re:Analyzing Caltrain Delays by avuserow on Thursday March 10, 2016 @07:11PM (#11263616)
Faster acceleration. Each stop will cost less time, and Caltrain has a surprising amount of stops between SF-SJ (22 weekday) for its length (47 miles). You can see this effect already with the amount of express schedules that Caltrain has and their varying trip times.
Re:Analyzing Caltrain Delays by nulltype on Friday March 11, 2016 @03:02AM (#11265332)
Yeah I couldn't find any estimates about how much time though. It seems like the express train would not be affected much at all.
Re:Analyzing Caltrain Delays by dasil003 on Thursday March 10, 2016 @07:12PM (#11263624)
Not if it still runs at-grade and keeps killing someone every few weeks.
Re:Analyzing Caltrain Delays by ZanyProgrammer on Thursday March 10, 2016 @08:56PM (#11264139)
A lot of Caltrain suicides are the result of people stepping off platforms when Baby bullets pass through or trespassing on the tracks. Grade sep won't help that.
Re:Analyzing Caltrain Delays by mtviewdave on Thursday March 10, 2016 @08:20PM (#11263980)
It's not as if Caltrain is required to run at grade. It's just a historical artifact of how the system evolved. If we had the money and political will to replace Caltrain with BART, we'd have the money and will to create a grade-separated Caltrain.

What would be the advantage of BART over electrified, grade-separated Caltrain? I'm hard-pressed to think of one, and there's definitely one major disadvantage: the nonstandard rail gauge.

Re:Analyzing Caltrain Delays by ThrustVectoring on Thursday March 10, 2016 @08:53PM (#11264134)
It'd remove an onboarding/offboarding/payment stop at the Millbrae station.
Re:Analyzing Caltrain Delays by mtviewdave on Thursday March 10, 2016 @09:34PM (#11264265)
You don't need to replace Caltrain to achieve that. A easier solution would be to convert Caltrain to a gated fare system (like BART is now), and then put a combined BART and Caltrain station behind one set of turnstiles at Millbrae.
Re:Analyzing Caltrain Delays by ubernostrum on Thursday March 10, 2016 @09:54PM (#11264348)
While we're at it, why the hell isn't there all-day, every-day direct service from Millbrae to SFO? Having a massive multi-transit-agency station right by the airport, only to tell people "nope, can't get there from here, you have to go to San Bruno and change trains" is just dumb.
Re:Analyzing Caltrain Delays by mtviewdave on Friday March 11, 2016 @01:29AM (#11264991)
Every day direct BART service between SFO and Millbrae was the original intent, and they provided that level of service when the station opened. But ridership fell well below expectations, and BART eventually limited that service to nights and weekends only.